Excavation |
▣ Possible to construct only with minimal excavation on joints ▣ High stiffness pipe → High safety on road weight → Possibility on shallow laying → Reduction on excavation cost, reduction on excavation time, simplification of construction |
---|---|
Foundation / Laying |
▣ Special foundation like SAND-BED is not required due to high stiffness of pipe → Reduction on the cost of laying and handling of remaining soil |
Pipe joint |
▣ KP type joint - Possible to have join only with bolting ▣ TYTON type joint - simple due to absence of bolting time ▣ Possible to construct with the presence of small amount of rainfall and water |
Working condition / environment |
▣ Even under bad weather condition, it is possible to have joint work and there is almost no restriction on working condition. |
Facility |
▣ KP type - Uses wrench when bolting ▣ TYTON type - Only tools to pull the pipe is required ▣ Large scale of power or equipment is not required when having a joint work |
Joint coating |
▣ After connecting KP and TYTON joint , additional coating on inner and external side is not required |
Pipeline adjustment |
▣ Adjustment on center of pipe (height and location of the plane) and pipe extension - Center of ductile cast iron pipe can easily be adjusted by using various fittings and joint flexibility(Allowable angular deflection) of various standards. |
Construction of water main ductile cast iron pipe